Gam Civil Engineering was contracted for the installation of new foul water and storm water drainage systems and construction of new roads and footways.

Project Scope: Foul and Storm Water Drainage Wellingborough

· 1300m of foul water drainage at depths ranging from 1.5m to 6.5m deep and pipe size ranges between 150mm and 225mm, and all associated manholes.

· 1550m of storm water drainage at depths between 1m and 4m deep and pipe sizes between 150mm and 750mm, and all associated manholes.

· Installation of 20m of 3.600mm x 4.800mm PCC box culverts and headwalls.

· Excavation of 1150m of combined utility trenches.

· Construction of 10,500 m² of new roads and 4750m² of footways including 4900m of kerbs and Edgings.

· 12,500m³ of earthwork excavations and 5500m³ of topsoil strip.

· Provision of site engineering and supervision.